Y2 wholesaler made in China – replacement parts – in Bunia Democratic Republic of the Congo 112m-4 4kw Air Compressor AC Induction Motor with top quality

Y2  wholesaler  made in China - replacement parts -  in Bunia Democratic Republic of the Congo  112m-4 4kw Air Compressor AC Induction Motor with top high quality

We – EPG Group the greatest gearbox & motors , couplings and gears manufacturing unit in China with 5 different branches. For much more information: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828


Y2 Motor Functions

Electric motor body from fifty six – 355, output range from .17HP to 430HP.Motor mounting type B3 (IM 1001), B35 (IM 2001), B5 (IM 3001), B14 (IM 3601), B34 (IM 2101) Protection sort IP44, IP54, IP55 on request .Multiple mounting arrangement for optional .Aluminum body, stop shields and base Strong forged iron frame ,Substantial power cable,Shaft essential and protector supplied ,Excellent paint finish . steel shaft and stainless metal shaft is optional.Electrical motor constant responsibility S1,motor have vocuum impregnation for insulation, motor is class F insulation and class H insulation is optional.motor has been make according to ISO9001, CE, UL, CCC, GS request All of our goods are make according to GOST, RoHS and IEC regular.High overall performance and IE1, IE2, IE3 efficiency / IE1 Energy SAVEING,IE2 – High Effectiveness,IE3 Quality Performance.

two.Requirements

1. Silicon steel DR510, 800, 600, 360 normal use stamping of lamination stator and rotor die-casting
2. a hundred% copper winding and inserting stator (manual and semi-immediately)
3. Stator Vacuum impregnation and drying
four. CNC machining motor shaft, frame, finish shields, and many others
five. Professional workman inspecting spare components each processing
six. Electric motor assembly merchandise line
seven. Electric motor will a hundred% check ahead of painting. 
eight. Electric motor spray-paint on motor portray product line
nine. Electric motor will 100% check out again ahead of packing. 
An electrical motor from content to end motor, must pass 15 time verify, and 100% screening, output electrical power, voltage, electric existing, non-load, fifty% load, seventy five% load, 100% load and check out the nameplate, packing. Finally shipping and delivery to our client.

3.Specialized Knowledge

TYPE Output Current (A) Speed Eff. Power
Element
Ist/In Tstart/Tn Tmax/Tn
KW HP 380V 400V r/min %
Y2E1-631-two .18 .twenty five .53 .50 2720 sixty five .8 five.5 two.two two.two
Y2E1-632-two .25 .34 .sixty nine .sixty six 2720 68 .81 6.5 2.two 2.2
Y2E1-711-2 .37 .five .99 .94 2740 70 .81 seven two.two 2.2
Y2E1-712-2 .fifty five .seventy five 1.forty 1.33 2740 73 .82 7 2.two 2.3
Y2E1-801-2 .seventy five 1 1.eighty three 1.74 2830 75 .eighty three seven.five 2.2 two.3
Y2E1-802-two one.one one.five 2.58 two.45 2830 seventy seven .84 7.9 two.2 2.3
Y2E1-90S-two one.5 two 3.forty three three.26 2840 seventy nine .84 7.five two.two 2.3
Y2E1-90L-two 2.two 3 four.eighty five 4.61 2840 eighty one .eighty five seven.five 2.two 2.3
Y2E1-100L-two 3 four six.31 6.00 2870 eighty three .87 seven.5 two.two 2.3
Y2E1-112M-two four five.five eight.twelve seven.72 2880 eighty five .88 seven.five two.2 two.three
Y2E1-132S1-two five.five seven.five eleven.04 10.49 2900 86 .88 seven.five two.two two.three
Y2E1-132S2-2 7.5 10 14.88 fourteen.fourteen 2900 87 .88 7.five 2 two.3
Y2E1-160M1-two eleven 15 21.34 twenty.27 2940 88 .89 seven.5 2 two.3
Y2E1-160M2-two fifteen 20 28.seventy seven 27.33 2940 89 .89 seven.five 2 two.3
Y2E1-160L-two eighteen.5 twenty five 34.70 32.97 2940 ninety .nine 7.5 2 2.three
Y2E1-180M-2 22 thirty 41.27 39.twenty 2940 ninety .9 7.5 2 2.2
Y2E1-200L1-2 thirty 40 fifty five.fifty three 52.75 2950 91.2 .nine seven.5 two two.2
Y2E1-200L2-2 37 fifty sixty seven.89 sixty four.50 2950 ninety two .nine seven.5 two 2.two
Y2E1-225M-two forty five 60 82.thirteen 78.02 2970 92.three .9 7.five 2 two.two
Y2E1-250M-2 fifty five seventy five 99.eighty four ninety four.eighty five 2970 ninety two.five .nine seven.5 two 2.2
Y2E1-280S-two seventy five one hundred 134.98 128.23 2970 93 .nine 7.five two 2.2
Y2E1-280M-two ninety 125 161.63 153.55 2980 93.8 .nine seven.5 2 two.two
Y2E1-315S-2 one hundred ten 150 194.35 184.63 2980 94 .91 seven.one 1.eight 2.2
Y2E1-315M-two 132 a hundred and eighty 232.97 221.32 2980 94.five .91 7.1 1.eight 2.2
Y2E1-315L1-2 160 220 278.seventy three 264.seventy nine 2980 ninety four.six .92 7.one one.8 two.2
Y2E1-315L2-two 200 270 346.58 329.twenty five 2980 ninety four.8 .92 seven.one one.eight two.two
Y2E1-355M-two 250 340 431.87 410.27 2980 ninety five.three .ninety two 7.1 1.six 2.two
Y2E1-355L-2 315 420 544.15 516.94 2980 95.six .92 7.one 1.6 two.2
Y2E1-631-four .12 .16 .forty four .forty two 1310 fifty seven .seventy two five.2 two.four two.two
Y2E1-632-four .18 .25 .62 .59 1310 sixty .seventy three 5.2 two.four 2.2
Y2E1-711-four .twenty five .34 .79 .75 1330 sixty five .seventy four five.two two.four two.two
Y2E1-712-4 .37 .five 1.13 1.08 1330 67 .seventy four 5.two two.4 two.2
Y2E1-801-four .55 .75 one.fifty five one.47 1440 seventy one .seventy six 5.seven two.4 two.three
Y2E1-802-four .75 one two.03 1.ninety three 1440 seventy three .seventy seven 6 two.3 two.three
Y2E1-90S-4 1.one 1.five 2.89 2.75 1400 75 .77 6 2.3 two.three
Y2E1-90L-4 one.5 2 three.70 3.51 1400 78 .seventy nine 6 two.three 2.three
Y2E1-100L1-four 2.2 three 5.sixteen 4.ninety 1430 80 .eighty one 7 two.3 2.3
Y2E1-100L2-four three 4 six.seventy eight six.44 1430 eighty two .82 7 two.three 2.3
Y2E1-112M-four four 5.5 8.eighty two eight.38 1435 84 .eighty two seven 2.three 2.3
Y2E1-132S-4 5.five 7.5 11.eighty four eleven.twenty five 1440 eighty five .83 7 two.3 2.3
Y2E1-132M-4 7.five 10 fifteen.fifty nine 14.eighty one 1440 87 .84 7 2.3 two.3
Y2E1-160M-four eleven fifteen 22.sixty one 21.forty eight 1470 88 .84 seven two.two two.3
Y2E1-160L-four fifteen 20 30.thirteen 28.62 1470 89 .85 seven two.2 two.3
Y2-180M-four eighteen.five twenty five 36.eleven 34.31 1460 ninety.five .86 seven two.2 2.three
Y2-180L-4 22 thirty forty two.71 forty.58 1460 ninety one .86 7.five two.two two.3
Y2-200L-four 30 forty 57.sixty one 54.73 1470 ninety two .86 seven.5 two.two 2.3
Y2-225S-four 37 fifty 69.eighty five sixty six.36 1470 ninety two.5 .87 seven.5 two.two 2.three
Y2-225M-4 forty five sixty 84.sixty eight eighty.forty five 1470 92.eight .87 7.five two.2 2.three
Y2-250M-4 55 seventy five 103.28 ninety eight.twelve 1470 ninety three .87 7.2 2.2 two.3
Y2-280S-four seventy five one hundred 139.64 132.sixty five 1480 ninety three.8 .87 7.two two.2 two.three
Y2-280M-4 ninety one hundred twenty five 166.85 158.fifty one 1480 ninety four.2 .87 seven.2 two.2 2.three
Y2-315S-four a hundred and ten a hundred and fifty 200.ninety seven one hundred ninety.92 1480 ninety four.5 .88 seven.two two.2 2.3
Y2-315M-four 132 180 240.forty 228.38 1485 94.eight .88 7.two two.1 2.three
Y2-315L1-4 160 220 291.09 276.54 1485 94.9 .88 six.nine 2.1 2.3
Y2-315L2-four two hundred 270 359.forty 341.forty three 1485 ninety five .89 6.9 two.one 2.three
Y2-355M-4 250 340 442.85 420.seventy one 1490 ninety five.three .nine six.nine 2.1 2.two
Y2-355L-4 315 420 556.24 528.43 1485 ninety five.6 .nine 6.9 2.one 2.two
Y2E1-711-six .eighteen .twenty five .seventy four .70 850 56 .66 4 1.nine 2
Y2E1-712-6 .twenty five .34 .ninety five .90 850 59 .68 four one.nine 2
Y2E1-801-6 .37 .five 1.thirty 1.23 890 62 .7 four.7 1.9 2
Y2E1-802-6 .55 .seventy five 1.seventy nine one.70 890 65 .72 four.seven 1.9 2
Y2E1-90S-six .75 one two.eighteen 2.07 910 72.seven .seventy two 5.five 2 two.one
Y2E1-90L-6 one.1 one.five three.01 two.86 910 76 .73 5.5 2 two.1
Y2E1-100L-6 one.five two three.eighty five three.sixty five 940 seventy nine .seventy five five.five two 2.one
Y2E1-112M-six 2.two 3 five.forty three five.sixteen 940 eighty one .seventy six six.5 two 2.one
Y2E1-132S-6 3 four 7.31 six.ninety five 960 eighty two .76 six.5 two.1 2.1
Y2E1-132M1-6 4 five.5 nine.fifty two nine.04 960 eighty four .76 6.5 two.1 2.one
Y2E1-132M2-6 5.5 seven.5 12.sixty two eleven.ninety nine 960 86 .77 six.five 2.one two.1
Y2E1-160M-6 seven.five ten 16.ninety one 16.07 970 87.five .seventy seven six.5 2 two.1
Y2E1-160L-6 11 fifteen 23.eighteen 22.02 970 89 .eighty one 6.5 two two.1
Y2E1-180L-six 15 twenty 31.26 29.70 980 90 .eighty one six.five two.one 2
Y2E1-200L1-6 eighteen.5 25 37.sixty three 35.75 980 90 .eighty three 6.five two.1 two
Y2E1-200L2-6 22 30 forty three.25 forty one.09 980 ninety two .eighty four 7 2.1 2
Y2E1-225M-6 thirty forty fifty seven.thirty 54.forty three 980 92.5 .86 7 two.1 2
Y2E1-250M-six 37 fifty 70.forty four 66.92 980 ninety two.eight .86 seven 2 two
Y2E1-280S-6 forty five 60 85.03 eighty.78 990 ninety three.five .86 7 two 2
Y2E1-280M-6 fifty five seventy five 103.59 98.41 990 ninety three.8 .86 7 two two
Y2E1-315S-six seventy five one hundred 139.34 132.37 990 ninety four .87 6.seven 2 2
Y2E1-315M-6 ninety one hundred twenty five 168.79 160.35 990 ninety four.2 .86 six.seven two two
Y2E1-315L1-six a hundred and ten one hundred fifty two hundred.ninety seven a hundred ninety.92 990 94.five .88 6.7 2 2
Y2E1-315L2-six 132 one hundred eighty 240.sixty six 228.sixty two 990 94.7 .88 six.7 1.nine 2
Y2E1-355M1-6 one hundred sixty 220 292.01 277.forty one 990 ninety four.6 .88 six.7 1.nine 2
Y2E1-355M2-six two hundred 270 363.86 345.sixty seven 990 ninety four.9 .88 6.7 one.nine two

Why us? 
 

1.Lower MOQ: It can meet up with your promotional business quite well.
  
two.Very good Support : We deal with customers as close friends,providing 24 hrs a times 7days a 7 days provider assist.

 3.Very good Top quality :We have stringent high quality management program.Excellent popularity in the market place.
 
four.Fast & Cheap Shipping: We have massive low cost from forwarder.

FAQ

Q: Do you offer OEM service?

A: Yes 

Q: What is your payment expression?

A: thirty% T/T in advance, 70% harmony when getting B/L copy.  Or irrevocable L/C.

Q: What is your guide time?

A: About thirty days following acquiring deposit or first L/C.

The use of authentic tools manufacturer’s (OEM) part figures or trademarks , e.g. CASE® and John Deere® are for reference reasons only and for indicating merchandise use and compatibility. Our organization and the shown replacement areas contained herein are not sponsored, accepted, or created by the OEM.

Y2  wholesaler  made in China - replacement parts -  in Bunia Democratic Republic of the Congo  112m-4 4kw Air Compressor AC Induction Motor with top top quality

Y2  wholesaler  made in China - replacement parts -  in Bunia Democratic Republic of the Congo  112m-4 4kw Air Compressor AC Induction Motor with top quality