Much more importantly, we make specific areas according to equipped drawings/samples and warmly welcome OEM inquiries.
Components |
1. metallic:Aluminum/Metal/Alloy steel/Stainless steel/Brass,copper,bronze etc. two. plastic: Abs,POM,PE,PP,PVC,Personal computer,PMMA,Teflon,nylon and so forth. 3. others: carbon fiber, glass,fiberglass, wood, challenging rubber and so forth. |
Shade |
Silver, Gray, Black ,Gold or as client’s necessity |
Floor Roughness |
Ra0.4 ( without sharpening or grinding) |
Logo Strategy |
laser engraving, CNC engraving, monitor-printing and many others. |
Floor Finish |
Anodize polishing zinc/nickel/chrome/gold plating, sand blasting, ect. |
ToEPG manufacturer rotocultivator ploughshares in T. line had been chosen as the Nationwide Rotary Tillage Equipment Sector “Excellent Brand name Products” in 2007 by Rotocultivator Branch of China Agricultural Machinery Industry Association. lerance |
+/- .01–.05mm / can also be customized |
Certification |
ISO9001 SEPG |
Processing equipments |
CNC machining centre,NC lathe, Grinding machine, Automated lathe machine, Traditional lathe device,Milling machine,Drilling equipment,EDM,Wire-chopping machine,CNC bending equipment etc |
Tests device |
Coordinate measuring device,Impression measuring instrument,Caliper and many others |
Software |
Precision Healthcare Instruments/Electronic/ Industrial// Automation / motorcycle/3D printer |
Market |
Janpan,Korea, Europe,United states,CA.AU,Southeast Asia…. |
Support |
OEM,ODM or as client’s prerequisite |
Packaging & Delivery
Packaging Particulars
1. inner packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and so forth.
2. outer packaging: carton box, picket case, plate and so on.
3. as for every customers’ prerequisite
Port
xiamen, or as client’s need
Direct Time :
Amount(Pieces) | one – 20 | 21 – 100 | 101 – 1000 | >1000 |
Est. Time(times) | five | ten | 25 | To be negotiated |
Trade Terms | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s prerequisite |
Transport | By air (DHL,UPS,Fedex,EMS and so on.),By Sea,Convey… |
Payment Strategy | T/T(bank transfer),L/C,paypal,western union, moneygram,escrow, money and so forth |
Payment Terms | 50% just before manufacturing, fifty% just before shipping and delivery |
Packing | interior box,many boxes/grasp carton or as customer’s need |
Shipping time | 5-7days for Alanple time,5-25 times for generation |
Opinions